PDM3530L2130-500: APC IT Power Distribution Module 3 Pole 5 Wire 30A L21-30 500cm
MPN: PDM3530L2130-500|By: APC

Starting from
$1,080
Indicative. Final pricing is confirmed with your quote.
In Stockships worldwide
- Condition:
- New (authorized channel)
- Warranty:
- Manufacturer warranty, confirmed on your quote
Prefer your own inbox? Email us about this part
Bulk order? Request volume pricing
Authorized & warrantied
Sourced through authorized distribution, with the manufacturer warranty confirmed on your quote.
Compatibility checked
Validated against your server platform before dispatch.
Delivery & lead time
Confirmed with your quote, including expedited freight where available.
Business & public sector
POs, net terms and volume pricing for qualified organizations, government and edu.
Product overview
Part number PDM3530L2130-500 identifies this APC IT power distribution module 3 pole 5 wire 30A L21-30 500cm. Network management cards, environmental probes and the shutdown software are usually what make a UPS useful, and they are ordered separately. Tell us the monitoring you need and we will quote it as one bill of materials.
Quotes are itemised down to the accessories, so nothing that is needed to make the part work is left off and discovered later.
Specifications
- Manufacturer part number
- PDM3530L2130-500
- Product Type
- Power Distribution & UPS
- Manufacturer
- APC
The table below is what the PDU is documented as, not what we have inferred from the part number. If the figure you need is missing, ask and we will source it from the manufacturer.
Where the APC PDM3530L2130-500 is deployed
- Like-for-like replacement of PDM3530L2130-500 in an existing system
- Replacing batteries or a UPS at end of service life
- Adding metered or switched power to an existing cabinet
Who this part is for
- Data centre teams matching outlet type and phase to a rack build
- Facilities and IT sizing runtime against measured rather than nameplate load
- Integrators quoting PDUs, management cards and probes together
What you get ordering this from us
Ordered by part number
PDM3530L2130-500 is what is quoted and PDM3530L2130-500 is what ships; where an alternate code is genuinely the same part we name it rather than swap it silently.
Compatibility checked
We confirm the part is supported on your platform before it ships, rather than leaving the check to you.
No substitutions without asking
If we cannot supply the exact code we tell you what we can supply and why, rather than shipping an equivalent and letting you find out.
Questions buyers ask about this part
Is PDM3530L2130-500 genuine and is the warranty intact?
Yes. It ships new in APC packaging, which is what keeps the warranty and the firmware entitlement valid. Anything we cannot supply that way we tell you about before you order.
Will PDM3530L2130-500 work in my server?
Tell us the circuit feeding the rack, the plug types in it and the measured load. Outlet count is the last thing that matters; phase, connector and real draw are the first three.
Do you accept purchase orders and quote at volume?
Yes, POs from qualified organisations, net terms on approval, and banded pricing once the quantity is worth banding. Send the number and we will price it properly.
Compare other Power Distribution & UPS we stock
| Model | Brand | Key spec | Availability | From |
|---|---|---|---|---|
| Vertiv Geist GU10012L Metered 0U 24-Outlet | Vertiv | Capacity: 7.4kW | In Stock | $1,405 |
| Tripp Lite PDUMH15 Metered 1U 8-Outlet | Tripp Lite | Capacity: 1.4kW | In Stock | $310 |
| Eaton 5PX 1500VA 2U Rack/Tower | Eaton | Capacity: 1350W / 1500VA | In Stock | $1,065 |
| Nexus Compute C13 to C14 Power Cable 0.5m | Nexus Compute | Capacity: 10A 250V | In Stock | $5 |
| Dell Power Distribution Board Cable | Dell | N/A | In Stock | Request quote |
| Vertiv (Liebert) Liebert 4500W (5kVA) 120/208V Hot-Swap Power Module for Liebert APS AS5/AS6 UPS Systems | Vertiv (Liebert) | Power Rating: 4500W | In Stock | $4,585 |
Browse all Power Distribution & UPS or everything we stock from APC.
Specifying a system, not just the part?
Most parts we ship go into a system we also build and support.
