J1CC3: Dell 2400-Watts Platinum Power Supply For PowerEdge R740
MPN: J1CC3|By: Dell

Starting from
$245
Indicative. Final pricing is confirmed with your quote.
In Stockships worldwide
Key specs
- Power Rating
- 2400W
- Compatible Platform
- PowerEdge R740
- Efficiency Rating
- Platinum
- Condition:
- New (authorized channel)
- Warranty:
- Full manufacturer warranty
Prefer your own inbox? Email us about this part
Bulk order? Request volume pricing
Authorized & warrantied
Sourced through authorized distribution, with the full manufacturer warranty.
Compatibility checked
Validated against your server platform before dispatch.
Delivery & lead time
Confirmed with your quote, including expedited freight where available.
Business & public sector
POs, net terms and volume pricing for qualified organizations, government and edu.
Product overview
Dell lists J1CC3 as a 2400-Watts Platinum power Supply for PowerEdge R740. The input side has to suit the rack: voltage, connector and whether the circuit can carry another unit at all. Tell us what the PDU presents and we will confirm the variant.
Quote requests are answered within 48 business hours, with availability confirmed before you raise a purchase order rather than after.
Specifications
General
- Manufacturer part number
- J1CC3
- Product Type
- Power Supplies
- Manufacturer
- Dell
Technical specifications
- Power Rating
- 2400W
- Efficiency Rating
- Platinum
Compatibility & compliance
- Compatible Platform
- PowerEdge R740
The table below is what the power supply is documented as, not what we have inferred from the part number. If the figure you need is missing, ask and we will source it from the manufacturer.
Where the Dell J1CC3 is deployed
- Swapping out a failed power supply for J1CC3 under change control
- Holding a matched spare for a production chassis
- Re-rating power after adding accelerators or drives
Who this part is for
- Teams re-rating power after adding GPUs or a full drive complement
- MSPs holding a matched PSU spare per chassis family
- IT teams restoring redundancy after one supply in a pair has failed
What you get ordering this from us
Ordered by part number
J1CC3 is what is quoted and J1CC3 is what ships; where an alternate code is genuinely the same part we name it rather than swap it silently.
Matched to the installed unit
Send the part number already in the chassis and we supply its pair, including the efficiency grade that stops the mismatch alert.
Volume pricing
The listed price is per unit; tiered pricing applies at quantity and purchase orders are accepted.
Questions buyers ask about this part
Is J1CC3 genuine and is the warranty intact?
Yes, new and sealed, with the Dell warranty and the firmware update path intact. We do not sell refurbished stock as new, and we do not source grey-market units.
Will J1CC3 work in my server?
Send the server model and the part number of the supply already fitted. In a redundant pair both units have to match on wattage and efficiency grade, or the chassis alerts on every boot.
Do you accept purchase orders and quote at volume?
Yes. Purchase orders are accepted from qualified organisations, net terms are available on approval, and tiered pricing applies at quantity. Tell us how many you need.
Compare other Power Supplies we stock
| Model | Brand | Key spec | Availability | From |
|---|---|---|---|---|
| Dell 495W Hot-Plug Redundant Power Supply for PowerEdge Rack Servers | Dell Technologies | Efficiency: 80 PLUS Platinum | In Stock | $175 |
| HPE 500W Flex Slot Platinum Hot-Plug Power Supply for ProLiant Servers | HPE | Efficiency: 80 PLUS Platinum | In Stock | $190 |
| Supermicro 1200W Redundant Titanium Hot-Swap Power Supply Module | Supermicro | Efficiency: 80 PLUS Titanium | In Stock | $415 |
| Lenovo 750W 80 PLUS Platinum Hot-Plug Server Power Supply | Lenovo | Wattage: 750W | In Stock | $165 |
| IBM 550W 80 PLUS Platinum Hot-Plug Server Power Supply | IBM | Wattage: 550W | In Stock | $100 |
| HP 460W 80 PLUS Gold Hot-Plug Server Power Supply | HP | Wattage: 460W | In Stock | $60 |
Browse all Power Supplies or everything we stock from Dell.
Specifying a system, not just the part?
An accelerated node draws far more than a general-purpose server, so power is sized with the build rather than assumed from the chassis.
