9PZG4SBB0000001: Eaton IAC-D K-13 TP1 93PM Power Array Cabinet
MPN: 9PZG4SBB0000001|By: Eaton

Starting from
$24,640
Indicative. Final pricing is confirmed with your quote.
In Stockships worldwide
- Condition:
- New (authorized channel)
- Warranty:
- Manufacturer warranty, confirmed on your quote
Prefer your own inbox? Email us about this part
Bulk order? Request volume pricing
Authorized & warrantied
Sourced through authorized distribution, with the manufacturer warranty confirmed on your quote.
Compatibility checked
Validated against your server platform before dispatch.
Delivery & lead time
Confirmed with your quote, including expedited freight where available.
Business & public sector
POs, net terms and volume pricing for qualified organizations, government and edu.
Product overview
This is the Eaton IAC-D K-13 TP1 93PM power array cabinet, order code 9PZG4SBB0000001. Network management cards, environmental probes and the shutdown software are usually what make a UPS useful, and they are ordered separately. Tell us the monitoring you need and we will quote it as one bill of materials.
We return an itemised quote within 48 business hours, and we say plainly when a part is constrained rather than quoting a date we cannot hold.
Specifications
General
- Manufacturer part number
- 9PZG4SBB0000001
- Product Type
- Power Distribution & UPS
- Manufacturer
- Eaton
Technical specifications
- Product Model
- IAC-D
The table below is what the PDU is documented as, not what we have inferred from the part number. If the figure you need is missing, ask and we will source it from the manufacturer.
Where the Eaton 9PZG4SBB0000001 is deployed
- Like-for-like replacement of 9PZG4SBB0000001 in an existing system
- Replacing batteries or a UPS at end of service life
- Matching outlet type and phase to a new rack build
Who this part is for
- Data centre teams matching outlet type and phase to a rack build
- Facilities and IT sizing runtime against measured rather than nameplate load
- Teams replacing batteries or a UPS at end of service life
What you get ordering this from us
Ordered by part number
9PZG4SBB0000001 is what is quoted and 9PZG4SBB0000001 is what ships; where an alternate code is genuinely the same part we name it rather than swap it silently.
Sized on measured load
Runtime is calculated from what the rack actually draws rather than from nameplate wattage.
Battery date checked before dispatch
Batteries are consumable; we confirm the manufacture date rather than shipping stock that has been sitting.
Questions buyers ask about this part
Is 9PZG4SBB0000001 genuine and is the warranty intact?
Yes. It ships new in Eaton packaging, which is what keeps the warranty and the firmware entitlement valid. Anything we cannot supply that way we tell you about before you order.
Will 9PZG4SBB0000001 work in my server?
Tell us the circuit feeding the rack, the plug types in it and the measured load. Outlet count is the last thing that matters; phase, connector and real draw are the first three.
Do you accept purchase orders and quote at volume?
Yes. We quote against a purchase order and hold the price for the quote period, with tiered rates at quantity. Net terms are available once the account is approved.
Compare other Power Distribution & UPS we stock
| Model | Brand | Key spec | Availability | From |
|---|---|---|---|---|
| APC AP7921B Switched Rack PDU 8-Outlet 1U | APC | Capacity: 3.7kW | In Stock | $805 |
| Vertiv Geist GU10012L Metered 0U 24-Outlet | Vertiv | Capacity: 7.4kW | In Stock | $1,405 |
| Tripp Lite PDUMH15 Metered 1U 8-Outlet | Tripp Lite | Capacity: 1.4kW | In Stock | $310 |
| Nexus Compute C13 to C14 Power Cable 0.5m | Nexus Compute | Capacity: 10A 250V | In Stock | $5 |
| Dell Power Distribution Board Cable | Dell | N/A | In Stock | Request quote |
| Vertiv (Liebert) Liebert 4500W (5kVA) 120/208V Hot-Swap Power Module for Liebert APS AS5/AS6 UPS Systems | Vertiv (Liebert) | Power Rating: 4500W | In Stock | $4,585 |
Browse all Power Distribution & UPS or everything we stock from Eaton.
Specifying a system, not just the part?
Most parts we ship go into a system we also build and support.
