6C11W: Dell 1400-Watts Platinum Power Supply For PowerEdge R750
MPN: 6C11W|By: Dell

Starting from
$980
Indicative. Final pricing is confirmed with your quote.
In Stockships worldwide
Key specs
- Power Rating
- 1400W
- Compatible Platform
- PowerEdge R750
- Efficiency Rating
- Platinum
- Condition:
- New (authorized channel)
- Warranty:
- Full manufacturer warranty
Prefer your own inbox? Email us about this part
Bulk order? Request volume pricing
Authorized & warrantied
Sourced through authorized distribution, with the full manufacturer warranty.
Compatibility checked
Validated against your server platform before dispatch.
Delivery & lead time
Confirmed with your quote, including expedited freight where available.
Business & public sector
POs, net terms and volume pricing for qualified organizations, government and edu.
Product overview
Dell lists 6C11W as a 1400-Watts Platinum power Supply for PowerEdge R750. The input side has to suit the rack: voltage, connector and whether the circuit can carry another unit at all. Tell us what the PDU presents and we will confirm the variant.
We return an itemised quote within 48 business hours, and we say plainly when a part is constrained rather than quoting a date we cannot hold.
Specifications
General
- Manufacturer part number
- 6C11W
- Product Type
- Power Supplies
- Manufacturer
- Dell
Technical specifications
- Power Rating
- 1400W
- Efficiency Rating
- Platinum
Compatibility & compliance
- Compatible Platform
- PowerEdge R750
The table below is what the power supply is documented as, not what we have inferred from the part number. If the figure you need is missing, ask and we will source it from the manufacturer.
Where the Dell 6C11W is deployed
- Like-for-like replacement of 6C11W in an existing system
- Adding a second supply to a chassis shipped with one
- Holding a matched spare for a production chassis
Who this part is for
- MSPs holding a matched PSU spare per chassis family
- IT teams restoring redundancy after one supply in a pair has failed
- Teams re-rating power after adding GPUs or a full drive complement
What you get ordering this from us
Ordered by part number
The order is placed against 6C11W, not against a description of it, so there is no room for a substitution you did not agree to.
Matched to the installed unit
Send the part number already in the chassis and we supply its pair, including the efficiency grade that stops the mismatch alert.
Draw calculated, not assumed
We work out what the configuration actually pulls before recommending a wattage.
Questions buyers ask about this part
Is 6C11W genuine and is the warranty intact?
Yes. It ships new in Dell packaging, which is what keeps the warranty and the firmware entitlement valid. Anything we cannot supply that way we tell you about before you order.
Will 6C11W work in my server?
Send the server model and the part number of the supply already fitted. In a redundant pair both units have to match on wattage and efficiency grade, or the chassis alerts on every boot.
Do you accept purchase orders and quote at volume?
Yes. We quote against a purchase order and hold the price for the quote period, with tiered rates at quantity. Net terms are available once the account is approved.
Compare other Power Supplies we stock
| Model | Brand | Key spec | Availability | From |
|---|---|---|---|---|
| Dell 495W Hot-Plug Redundant Power Supply for PowerEdge Rack Servers | Dell Technologies | Efficiency: 80 PLUS Platinum | In Stock | $175 |
| HPE 500W Flex Slot Platinum Hot-Plug Power Supply for ProLiant Servers | HPE | Efficiency: 80 PLUS Platinum | In Stock | $190 |
| Supermicro 1200W Redundant Titanium Hot-Swap Power Supply Module | Supermicro | Efficiency: 80 PLUS Titanium | In Stock | $415 |
| Lenovo 750W 80 PLUS Platinum Hot-Plug Server Power Supply | Lenovo | Wattage: 750W | In Stock | $165 |
| IBM 550W 80 PLUS Platinum Hot-Plug Server Power Supply | IBM | Wattage: 550W | In Stock | $100 |
| HP 460W 80 PLUS Gold Hot-Plug Server Power Supply | HP | Wattage: 460W | In Stock | $60 |
Browse all Power Supplies or everything we stock from Dell.
Specifying a system, not just the part?
An accelerated node draws far more than a general-purpose server, so power is sized with the build rather than assumed from the chassis.
